-
-
-
Explanation
-
MENU
OPPC intermediate joint box
Keyword:
Products
News
Download
Select an appropriate location (C phase) on the line tension tower, design a fixed stand, install the OPPC intermediate joint box, make the joint and seal the joint box, and then use a power jumper with a parallel groove wire clamp to jumper the OPPC at both ends of the joint box to ensure the connectivity of the wires.
Keyword:
Latest Products
Latest News
Contact LUXIN
West of Gongyi Road, Economic Development Zone (West), Shizhuang Street, Qufu City, Jining City, Shandong Province, China